Myanmar/Malaysia-India-Singapore Transit (MIST) Submarine Cable System
Recently, the union environment ministry’s expert appraisal committee (EAC) on Coastal Regulation Zone (CRZ) matters has given its go-ahead for the construction of Myanmar/ Malaysia- India- Singapore Transit (MIST) Submarine Cable System.
About MIST Submarine Cable System
- It has a total length of 8,100km, connecting Singapore, Malaysia, Myanmar, Thailand, India (Mumbai and Chennai).
- It is being executed by the global technology provider NEC Corp.
- This will be the 17th such optical fibre cable system to land in Mumbai, and is expected to be ready for service sometime in 2023.
- Out of the total 8,100km length of the cable system, about ....
Do You Want to Read More?
Subscribe Now
Take Annual Subscription and get the following Advantage
The annual members of the Civil Services Chronicle can read the monthly content of the magazine as well as the Chronicle magazine archives.
Readers can study all the material before the last six months of the Civil Services Chronicle monthly issue in the form of Chronicle magazine archives.
Related Content
- 1 UN80 Initiative
- 2 Operation Spider’s Web
- 3 Sustainable Development Report (SDR) 2025
- 4 India-Norway Maritime Talks
- 5 India Slams OIC for Comments on Indian Muslims, Kashmir
- 6 Iran Declared in Breach of Non-Proliferation Obligations
- 7 India–Japan Maritime Cooperation
- 8 India Wins IIAS Presidency for 2025–2028
- 9 China Hosts First-Ever Trilateral Meeting with Pakistan and Bangladesh
- 10 India Elected to UN ECOSOC for 2026–28 Term