Battery Energy Storage System: Empowering the Future
On 6th September, 2023, the Union Cabinet approved to a plan aimed at providing viability gap funding (VGF) to establish a resilient energy storage infrastructure designed to store surplus wind and solar energy.
- This initiative outlines the development of 4,000 megawatt-hours (MWh) of Battery Energy Storage System (BESS) projects by the end of the fiscal year 2031. The scheme has an initial outlay Rs. 9,400 crore, with Rs. 3,760 crore provided as budgetary support.
Battery Energy Storage System (BESS)
- Battery Energy Storage System, often abbreviated as BESS, is a sophisticated system designed for the primary purpose of storing electrical energy in ....
Do You Want to Read More?
Subscribe Now
Take Annual Subscription and get the following Advantage
The annual members of the Civil Services Chronicle can read the monthly content of the magazine as well as the Chronicle magazine archives.
Readers can study all the material before the last six months of the Civil Services Chronicle monthly issue in the form of Chronicle magazine archives.
Related Content
- 1 Drought: Escalating Risks to Communities, Ecosystems, and Economies
- 2 India-Croatia: Deepening Partnership
- 3 Bonn Summit Sets Tense Stage for COP30
- 4 Climate Induced Migration: A Multidimensional Challenge Requiring Global Action
- 5 India-Cyprus Five-Year Strategic Roadmap
- 6 Urban Drainage Crisis in India
- 7 Unwrapping India’s Food Safety Challenges
- 8 Reforming Agricultural Subsidies in India: Towards Efficiency, Equity, and Sustainability
- 9 India’s Data Imperative: The Pivot Towards Quality
- 10 Semiconductors: Powering India’s Digital Ecosystem