Arun-3 Hydroelectric Project
Recently, the Power Secretary reviewed the progress of SJVN’s 900 MW Arun-3 Hydroelectric Project in Nepal.
- It is a 900 MW run-of-the-river hydropower project being developed on the Arun River in the Sankhuwasabha District of Eastern Nepal. Arun is a tributary of the Koshi River in Nepal.
- It envisages a concrete gravity dam about 70m high and a Head Race Tunnel (HRT) of 11.74 km with an underground power house containing four generating units of 225 MW each on the left bank..
- It is being developed on a build-own-operate and transfer (BOOT) basis by Satluj Jal Vidyut Nigam (SJVN) Arun 3 Power Development ....
Do You Want to Read More?
Subscribe Now
Take Annual Subscription and get the following Advantage
The annual members of the Civil Services Chronicle can read the monthly content of the magazine as well as the Chronicle magazine archives.
Readers can study all the material before the last six months of the Civil Services Chronicle monthly issue in the form of Chronicle magazine archives.
Related Content
- 1 Periyar Cow
- 2 Online Bond Platform Provider
- 3 Parichha Dam
- 4 Vizhinjam Port
- 5 Greenium and Sovereign Green Bonds
- 6 Floating-Rate Loans
- 7 India’s Evolving Energy Landscape
- 8 Pradhan Mantri Surya Sarovar Yojana
- 9 Incentive Scheme for Promotion of Domestic Piped Natural Gas Connections
- 10 Samudra Manthan: National Offshore Exploration Scheme

