Bihar’s First Floating Solar Power Plant
Bihar Renewable Energy Development Agency (BREDA) is set to commission the state’s first two MW floating solar power plant in Darbhanga district.
- The solar power plant will be directly connected to the utility power grid from where power will be supplied to consumers.
- The project is a part of efforts to tap as well as to generate mass awareness about solar energy.
Impact
- Sustainable Development: The floating power plant will help meet two goals: Produce green energy from solar panels and promote fish farming.
- Reducing Carbon Dioxide: It will generate 2.7 million units annually and will help in reducing 64,125 tonnes of ....
Do You Want to Read More?
Subscribe Now
To get access to detailed content
Already a Member? Login here
Take Annual Subscription and get the following Advantage
The annual members of the Civil Services Chronicle can read the monthly content of the magazine as well as the Chronicle magazine archives.
Readers can study all the material since 2018 of the Civil Services Chronicle monthly issue in the form of Chronicle magazine archives.
Economy Watch
- 1 Securities Transaction Tax (STT)
- 2 New Initiatives to Boost Infrastructure Growth
- 3 Foreign Currency Settlement System for GIFT IFSC
- 4 Angel Funds: SEBI Extends Timeline to Disclose Allocation Methodology
- 5 RBI Grants Exemption to SWAMIH Fund-I
- 6 World Cotton Day 2025
- 7 Changes in Per Drop More Crop Scheme: Strengthening Water Conservation and Farmers’ Income
- 8 First State Mining Readiness Index to Boost Mineral Sector Reforms
- 9 Ministry of Mines Classifies Limestone as Major Mineral Completely
- 10 Sundarbans SAIME Model Wins FAO Global Recognition

