Uttarakhand Crosses 1 GW Solar Capacity
Recently, Uttarakhand surpassed 1 gigawatt (GW) of installed solar power capacity, with total installations reaching over 1,027.87 MW.
- The achievement strengthens the state’s clean energy transition, sustainable development goals and energy self-reliance.
- Around 397 MW has come from ground-mounted solar projects.
- 241 MW has been installed through rooftop systems under the PM Surya Ghar scheme.
- 137 MW has been added under the Chief Minister Solar Self-Employment Scheme.
- 110 MW has been installed through commercial net metering.
- 51 MW has come from captive solar plants.
- 37 MW has been generated through canal-top and canal-bank solar ....
Do You Want to Read More?
Subscribe Now
Take Annual Subscription and get the following Advantage
The annual members of the Civil Services Chronicle can read the monthly content of the magazine as well as the Chronicle magazine archives.
Readers can study all the material before the last six months of the Civil Services Chronicle monthly issue in the form of Chronicle magazine archives.
Related Content
- 1 Startup Policy 2026
- 2 Chief Minister’s Teachers’ Cashless Medical Scheme
- 3 India Unveils First Made-in-India EXIM Shipping Container
- 4 India's Sixth Fully Literate State
- 5 Two Anti-Crime Laws Come into Force
- 6 Chief Minister Bihar Heli-Tourism and Air Tourism Service Scheme-2026
- 7 Post-Matric Scholarship Scheme for SC Students
- 8 PM Launches Development Projects
- 9 Green Drive Portal
- 10 Cabinet Approves 12 Major Development Proposals

